Bulk excavation, rock breaking, site cuts and spoil removal, run with our own plant and our own operators so the ground work does not become somebody else’s program.
Why the excavation decides the program
Excavation is the half of a retaining wall job that nobody sees once it is finished, and it is the half that decides whether the rest of the program holds. Get the levels wrong, hit rock without the gear to deal with it, or find there is nowhere to put the spoil, and every trade behind you moves.
We run the plant ourselves rather than hiring it in. That means the excavator, the hydraulic hammer and the rock augers are on site when the ground turns out to be harder than the soil report suggested, instead of a fortnight away. Because we also build the retaining walls that hold these cuts, the dig is planned around the structure from the first set out rather than handed over and hoped for.
Registered building practitioner CDB U 58737. Where the excavation supports a wall, that wall is designed and built to AS 4678, the Australian Standard for earth retaining structures, which sets out how the loads on a wall are calculated and how it has to be drained.
Our excavation capability
-
Site cutsCutting a level, stable building platform out of a block that has not got one. -
Bulk excavationMoving volume to a design level, set out to survey rather than to a stake in the ground. -
Rock breakingHydraulic hammer and rock augers in house, so hard ground does not mean waiting on a specialist. -
Spoil removalCartage coordinated with the dig, for sites with nowhere to stockpile.
What it solves
- Ground that turns out to be rockHammer and augers are ours. Hard ground changes the method, not the program.
- Access a truck will not takeOn constrained sites the access is built as part of the job, before the volume starts moving.
- Nowhere to put the spoilCartage is planned against the dig rate before the machine arrives, not discovered on day two.
- A dig that has to support a wallThe excavation is set out to the wall design, so the batter, the working space and the drainage line are right the first time.
- Registered builderCDB U 58737
- Own plantIn house, not hired in
- Rock capabilityHammer and augers
- Set out to surveyNot to a stake in the ground
Send the levels and the access
The design level, what is coming out of the ground, and how a truck gets to it. That is enough to tell you how the dig runs and what the program looks like.