Eastern Melbourne Earthworks

Retaining walls

Retaining wall builders

Structural retaining walls across Melbourne, built to AS 4678 by a registered building practitioner, with the excavation, drilling and footings done by the same crew that builds the wall.

The ground decides the wall

Most people arrive knowing roughly how much fall they have and very little else. That is the normal starting point. What actually decides the wall is what sits behind it, what is under it, and how much water moves through it, and none of that is visible from the top of the bank.

Under about a metre, with nothing bearing on the ground behind it, a wall is a landscaping job and is priced as one. Above that, or with a driveway, a structure or a boundary involved, it becomes a structure. It needs a design, it generally needs a building permit, and it needs somebody who can be held to both.

Four wall types cover nearly everything we are called for. Each page below sets out what that wall is for, and where it stops being the right answer.

What we are usually called for

Why us

What separates a wall builder from a landscaper

Anybody can stack a wall. The difference shows up in the part nobody can see once the job is finished.

  • Registered building practitioner

    CDB U 58737. Once a wall needs a building permit, the work has to be carried out by a registered builder. That is what allows the permit pathway, the building contract and the insurance to sit with the same business that builds the wall.

  • The excavation is not a separate trade

    Site cuts, bulk excavation, drilling and deep footings stay in the business because the structure fails without them. One program, one crew, and the footing and the wall set out to the same drawing.

  • Built to AS 4678

    The Australian standard for earth retaining structures. Where engineering exists we build to it. Where the ground on site does not match the report, that gets raised before anything is poured, not after.

  • The buried work is photographed

    Depth, drainage and compaction decide whether a wall lasts, and all three are invisible by handover. They get photographed as the work goes in and handed over as part of the record.

Tell us what the site is doing

If engineering exists we price the documented works. If it does not, we organise it. Either way you get a straight answer the same day, and we will tell you if it is not a job for us.